Tony and Steve raise the bedroom/bathroom wall. We decided to use 6" rather than 4" walls for a more substantial structure and better insulation. Besides, it will allow us to build a deeper sill on the windows. But, it makes for a heavy lift.l | ||
Within a few days, the exterior walls have been fully framed. | ||
|
||
Then on day 28, the crane arrives to lift the roof trusses in place.
|
||
This is clearly the moment that the neighborhood kids (and adults) have been waiting for. Huge machinery, lots of noise and a flying roof make for an excellent show. | ||
Steve seems pretty comfortable walking around on the wall plates. | ||
Return to main page |